Month: June 2021
-
"Right to vote": "Ukravtodor" will abandon current midterm repair projects: what will happen to the roads?"
Viktor Medvid, Director of William invest expert consulting company, is our guest.
-
Why do the roads built as part of the Big Construction project quickly fail?
It is said that many Ukrainian roads were built under the old GOST legislation, which did not provide for mandatory inspection of the road base, so the top asphalt layer has deteriorated. But this is absolutely untrue, because even under the old GOST, every road must be examined before construction begins, so if the foundation is bad, no one should put on the top layer of asphalt. The situation during the broadcast...
-
Victor on the norms for road construction
For each type of road, depending on its class and the load it carries, there are different timeframes for construction. Minimum 3 years and maximum 10 years, depending on the type of road. These plans should include both current and capital repairs. The situation is analyzed on the air on Golos UA...